Acme pest control is backed up by the team of highly professional pest control technicians and operators. We have engaged ourselves in providing an effective pre construction termite control services to our clients for over a decade now. we use the best quality chemicals and with our anti- termite control services we have treated both residential and commercial projects at the pre construction stage itself.

Termites Control

Pre-construction termite control services:

Subterranean termites:

The main objective of this treatment is to create a chemical barrier all around the building so that we can create a strong barrier and deny the entry of the termites into the buildings.

Treatment For Building Without Basement

The treatment will start after the foundation level itself and the plinth wall area construction is finished completely.

Top Surface Of Plinth Filling Treatment

After the process of filling soil in the plinth areas and before the packing of dry rubble the complete surface of the filled soil and the top surface of the beam or the plinth wall should be properly treated with the chemical emulsion.

Junction Wall and Floor Treatment

Throughout the area of the junction of wall and the soil filling the rodding should be carried out at metre . upto 30 cm can be the intervals. The formulated chemical emulsion should be sprayed in the wall junction so that it completely mixes with the broken up soil. The earth which is disturbed can be tamped back at the same place.

Soil Along The Externmal Perimeter Treatment

The soil which is around the external perimeter of the building upto30 cm depth should be treated at the linear meter of the plinth.

Soil in and around the waste, pipes and conduits

When we insert a wastes , conduicts or pipes in the soil inside the foundation area, the soil that is surrounding the point of entry must be maintained loose around these pipes , wastes and conduicts for a particular distance and the soil thus kept loose should be treated with the formulated chemical emulsion.

Treament For Buildings With Basement

The treatment starts here when the excavation is complete and before the laying of soil and pcc.

Soil below the raft treatment

Once the plinth area is filled with soil and before the dry rubble is packed, the entire surface of the soil filled and the top surface of the plinth wall or the beam should be treated with the formulated chemical emulsion.

Soil along the retaining wall treatment

The soil near the retaining wall should be treated and the treatment should be followed by back filling which is done in stages but not to exceed a depth of 1 meter.

Soil along the external perimeter of the building treatment

The soil which around the external perimeter of the building upto a depth of about 30 cm should be treated.

Soil in and around the waste, pipes and conduits

When we insert a wastes , conduicts or pipes in the soil inside the foundation area, the soil that is surrounding the point of entry must be maintained loose around these pipes for a distance of about 15cm and to a depth of 7.5cm , wastes and conduicts for a particular distance and the soil thus kept loose should be treated with the formulated chemical emulsion.